Project Details
Project Organization (Click to see chart)
Client and Consultants
Client | KAHRAMAA Qatar General Electricity and Water Corporation P.O. Box 41, Doha, Qatar, www.km.com.qa Contacts: Eng. Mohammed Salem Al Mansoori, Manager, Water Projects Tel: +974 44845555 Eng. Jabr Rashed Al Nuaimi, Head of Main Water Projects Section Tel: +974 44845555 |
Project Management Consultant (PMC) | Main Consultant: M/s ENERGOPROJEKT-ENTEL LTD. PO Box 4769, Doha, Qatar, www.ep-entel.com Contact: Mr. Darko Jovicic, Manager - Projects Tel: +974 44478571, Email: [email protected] |
Sub-Consultant: M/s GKW Consult www.gkw-consult.com Contact: Mr. Gabriel Constantin – Project Coordinator Email: [email protected] |
|
Detailed Design & Site Supervision Consultant (DDSSC) | M/s Hyder Consulting Middle East PO Box 1854, Doha Qatar, www.hyderconsulting.com Contact: Mr. Badie Altimimi – Chief Resident Engineer, Doha Tel: +974 6629 6551, Email: [email protected] |
Contractors
GTC 541/2012 Earth Works at PRPS2 - Umm Slal | M/s Bin Omran Trading & Contracting PO Box 5006, Doha, Qatar Contact: Mr. Balamurugan – Project Manager Mobile: +974 66839632, Email: [email protected] |
GTC 551/2013 Earth Works at PRPS3 – Rawdat Rashed | M/s Redco International PO Box 16750, Doha, Qatar Contact: Eng. Mohammad Irfan Khan – Project Manager Mobile: +974 33718302, Email: [email protected] |
GTC 577/2013 Earth Works at PRPS 4 - Abu Nakhla | M/s Marco Trading and Contracting PO Box 2139, Doha, Qatar Contact: Mr. Sameer Amro – Project Manager Mobile: +974 55814087, Email: [email protected] |
GTC 542/2012 Earth Works at PRPS 5 – Al Thumama | M/s Boom Construction Company PO Box 22145, Doha, Qatar Contact: Mr. Tamer Kotiam – Project Manager Mobile: +974 33142045, Email: [email protected] |
GTC 600/2013 Pipelines for Mega Reservoirs CM-1 | Packages A & B: M/s Leighton Contracting (Qatar) WLL PO Box 36083, Doha, Qatar Contact: Mr. Daniel Viviers – Project Manager Mob. +974 77231539, E-mail: [email protected] |
Package C: M/s Al-Jaber Engineering Co. LLC PO Box 22801, Doha, Qatar Contact: Mr. Suhail Younis - Project Manager Mob. +974 50392736 E-mail: [email protected] |
|
GTC 599/2013 Pipelines for Mega Reservoirs CM-2 | Package A: M/s Al-Jaber Engineering Co. LLC PO Box 22801, Doha, Qatar Contact: Mr. Suhail Younis - Project Manager Mob. +974 50392736 E-mail: [email protected] |
Package B: M/s China Harbour Engineering Co. Ltd. PO Box 491, 8th Floor Al Mana Tower, Airport Rd, Doha, Qatar Contact: Mr. Dong Liangmin - Project Manager Mob. +974 55267991, E-mail: [email protected] |
|
GTC 606/2013 Transmission Pipelines Associated with Qatar Economic Zone (QEZ) Desalination Plant | M/s Sinohydro Group Limited PO Box 32431, Doha, Qatar Contact: Mr. Fan Lianyong - Project Manager Mobile: +974 50306625, Email: [email protected] |
GTC 611/2013 Transmission Pipelines For Mega Reservoirs | M/s C.A.T. BOOM Joint Venture PO Box 24794, Doha, Qatar Contacts: Mr. Nizar Attieh - Project Manager Mobile: +974 50459356, Email: [email protected] Mr. Yoseph Yazbek - Deputy Project Manager Mobile: +974 55883463, Email: [email protected] |
GTC 626/2014A Construction of Mega Reservoir PRPSs (Package A), Umm Birka | M/s Consolidated Contracting Group (CCC) & Teyseer Contracting Co. JV PO BOX 23897, Doha, Qatar Contacts: Mr. Anan Al-Amad - Project Director Mobile: +974 33857460, Email: [email protected] Mr. Mr. Bassam Hajj Ali - Project Manager Mobile: +974 55834625, E-mail: [email protected] |
GTC 626/2014B Construction of Mega Reservoir PRPSs (Package B), Umm Slal | M/s HBK Contracting Co. P.O.Box 1362, Doha – Qatar Contact: Mr. Ughandhar DR.- Project Director Mobile: +974 50171425, Email: [email protected] |
GTC 626/2014C Construction of Mega Reservoir PRPSs (Package C), Al Thumama | M/s Consolidated Contracting Group (CCC) & Teyseer Contracting Co. JV PO BOX 23897, Doha, Qatar Contacts: Mr. Anan Al-Amad - Project Director Mobile: +974 33857460, Email: [email protected] Mr. George Dib - Project Manager Mobile: +974 55884347, Email: [email protected] |
GTC 626/2014D Construction of Mega Reservoir PRPSs (Package D), Rawdat Rashed | M/s Leighton Contracting Qatar P.O. Box 36083, Doha, Qatar Contact: Mr. Mohammad Islam - Project Director Mobile: +974 74794284, Email: [email protected] |
GTC 626/2014E Construction of Mega Reservoir PRPSs (Package E), Abu Nakhla | M/s China Gezhouba Group (CGGC) & Burhan JV P.O. Box 96740, Doha, Qatar Contacts: Mr. Shen Junyan – General Manager Mobile: +974 66756276, Email: [email protected] Mr. Waqas Safdar - Manager Business Development Mobile: +974 66882807, Email: [email protected] |
Mega Reservoirs SCADA Integration | TBA |
Main Equipment Suppliers
Ductile Iron (DI) Pipes & Fittings | Kubota Japan, Saint-Gobain PAM France |
Split Case Pumps | Kubota Japan, Torishima Japan |
Large Dia Valves | KSB Italy, Saint-Gobain PAM France / Italy, VAG Germany |
Control System Equipment | TBA |
Primary Reservoirs & Pumping Stations (PRPSs) and Water Pipelines Main Technical Data
Total storage volume | First Phase: 2,300 MIG (approx. 10 million m3) in 24 concrete reservoirs Second Phase: 3,800 MIG (approx. 17 million m3) in 40 concrete reservoirs |
Storage per each PRPS | 4-5 reservoirs per PRPS in the first phase with ultimately 7-9 reservoirs per PRPS after the second phase Reservoirs dimensions and capacity: 300x150x12 m and 86-97 MIG |
Pumps capacities | Per single pump: 0.4-1.85 m3/s (1500-6650 m3/h) Per PRPS: max. 6.5 m3/s (23000 m3/h) |
DI pipelines to be constructed in the first phase: | Corridor Mains: 280 km (DN 1200-1600) Transmission Pipelines: 200 km (DN 900-1600) |